Four Hours of Grid. Four Brainy Eco Boxes. A Sub-District Hospital in Anantnag.
The company blog titled it Jammu. The body named Anantnag. The kit was four Brainy Eco 1100s — not a 10 kW roof.
By Kunwer Sachdev · Founder & Managing Director, 1988–2018 · Published 11 September 2026 · Historical era: December 2016
Primary source: recovered company blog, archive page (Wayback, 25 December 2016). Narrated by a Su-Kam service engineer. This page does not claim I commissioned the hospital in person.
1. What the 25 December 2016 post actually said
By Kunwer Sachdev (Founder & Managing Director, 1988–2018)
The headline said twenty hours of daily power cuts made a hospital in Jammu install solar. The body is more precise. The site is Sub District Hospital, Anantnag, Jammu and Kashmir. Grid for 4 to 5 hours a day. The rest was diesel, and diesel was expensive.
The hospital needed its basic light load for 24 hours. Management wanted a long-term answer and less generator fuel. December in the valley still had about ten hours of daylight, the post said. They called the authorised distributor in Jammu, Mr. Nisar of Shah Agency. After inspection he specified four separate Brainy Eco kits, one department at a time — not one big PCU for the whole building.
From that post, not from a later catalogue: four Su-Kam Brainy Eco 1100; with each box, three 100 W panels and a 150 Ah solar battery. Each kit about 2 to 3 units a day, sized to run ten tubelights. Brainy Eco is an intelligent off-grid box that can run on solar or mains. Select grid priority and the load takes mains when it is there and the battery charges from mains; the rest of the time solar has priority. Select solar priority and you use the sun first. That is the product I had put in the market. Mr. Zuber Ahmed, senior engineer at the hospital, is quoted: they came after satisfactory feedback, discussed it with Mr. Nisar, installed four Brainy Ecos, and they were working.
Why this is not the Warangal roof
Warangal in 2013 was a 10 kW rooftop on a named nursing home. Anantnag in 2016 was four small hybrid UPS kits on lighting circuits. Same hospital problem — the grid will not stay up — different SKU. I will not mash them into one “hospital solar” number.
Related Su-Kam training film — Brainy Eco install. Not an Anantnag site video.
2. Ground record from the 25 December 2016 post
| Parameter | From the recovered company blog |
|---|---|
| Company blog | 25 December 2016 — narrated by a Su-Kam service engineer |
| Site named | Sub District Hospital, Anantnag, Jammu and Kashmir |
| Grid before solar | 4–5 hours a day; diesel the rest of the time |
| Kit | 4 × Brainy Eco 1100; 3 × 100 W panels and 150 Ah battery with each |
| Load per kit | ~2–3 units/day; ten tubelights; different departments |
| Hospital quote | Mr. Zuber Ahmed, senior engineer — four Brainy Ecos working |
| Distributor named | Mr. Nisar, Shah Agency, Jammu |
3. Hub
- Episode 7 — Warangal 10 kW, Lalitha Nursing Home
- Episode 9 — Kannauj 250 kW mini-grid, Dr. Kalam
- Recovered archive page (slug still jammu-hospital)
- Facebook Archive
- Su-Kam Solar YouTube (@sukam)
Historical Documentation Notice:
This article documents a historical installation from the tenure of Kunwer Sachdev as Founder & Managing Director of Su-Kam Power Systems Ltd. (1988–2018). He exited in 2019 under the IBC process and holds no association with Su-Kam or its subsequent management. Site, kit and quotes are taken from the recovered 25 December 2016 company blog. The archive slug still says “Jammu”; the body of that post names Anantnag.